Germantown Neighborhood Connection Project
Project Overview
This major infrastructure investment aims to improve safety, connectivity, and accessibility in the Germantown section of Wissahickon Valley Park. This area of the park is disconnected from the mainstem of the park by Lincoln Drive. Driven by community input, Phases I and II will introduce infrastructure upgrades and new amenities including rehabilitated trails, reconstructed sidewalks, and a new All Persons Trail.
Want project updates? CLICK HERE to sign up for email updates.
Phase I
Phase I focuses on the parkland between Walnut Lane and the Henry Houston Memorial Statue. This area features existing trail loops and historic infrastructure that showcases the legacy of the Jane Bayard Henry house ruins and gardens. Safe access to the trailhead and Houston Statue was previously limited by crumbling sidewalks along Harvey Street.

Restored Historic Staircase
Since 2022, FOW has completed trail, habitat, and pedestrian infrastructure improvements, including:
- Rerouting 110 LF of multi-use trail
- Constructing and installing a wooden footbridge
- Installing wayfinding signage, including a kiosk at the Harvey Street trailhead
- Restoring three historic stone staircases
- Planting more than 350 native trees, shrubs, and forbs.
- Constructing sidewalks and curbing along both sides of Harvey St from the SEPTA overpass to Lincoln Dr
- Adding a new mid-block crosswalk.

FOW Staff Installing a Retention Wall

Harvey St Sidewalks Before and After
Upcoming, Philadelphia Streets Department will install permanent speed cushions, and FOW staff and volunteers will complete beautification of the Henry Houston Statue and add new trailhead seating and interpretive signage.

Henry Houston Statue Area
Project Partners: Philadelphia Parks and Recreation, Philadelphia Streets Department, Councilwoman Cindy Bass (District 8), Lower Harvey Street Neighbors
Design Consultant (for sidewalks & crosswalk): Terracon (Previously named Skelly & Loy)
Construction Contractor (for sidewalks & crosswalk): Gessler Construction Co., Inc.
Phase I of this project is funded by the Pennsylvania Department of Conservation and Natural Resources Bureau of Recreation and Conservation Environmental Stewardship Fund, Commonwealth of Pennsylvania, Department of Community and Economic Development, The McLean Contributionship, National Recreation and Park Association through their corporate sponsor Sensodyne, Councilwoman Cindy Bass, The Garden Club of Philadelphia, and Clean Air Council’s Feet First Philly grant program.
Phase II
Phase II encompasses construction of the park’s first All Persons Trail, improvements at the Jane Henry Foundation, and the development of public art.

All Persons Trail Design Map
An All Person’s Trail (APT) is designed to be inclusive for visitors of all ages and physical abilities. Guided by the 1968 American Barriers Act (ABA) Pedestrian Recreation Trail Guidelines, this trail will be a wide, smooth crushed gravel path with minimal slopes and multiple rest areas with seating. The APT will be constructed in 2027 on parkland between Lincoln Drive and Morris Street as a hybrid project with professional trail builders from the Appalachian Mountain Club and FOW’s trained volunteer corps.
In tandem with this new trail, FOW will also install new park amenities and complete habitat restoration. Amenities will include upgraded benches along Morris St, seating at the trailhead and various rest areas along the trail, trailhead signage, and playful learning infrastructure.
FOW is partnering with Playful Learning Landscapes to gather community input to inform the design of playful learning infrastructure that will be installed along new APT at selected rest areas.
FOW will host a public community meeting in October 2026 to learn more about community members’ needs and desires for the upcoming All Persons Trail amenities. To receive meeting details CLICK HERE to sign up for email updates.
Project Partner: Philadelphia Parks and Recreation
Designer and Builder: Appalachian Mountain Club
Playful Learning Consultant: Playful Learning Landscapes & Future Together
Phase II of this project is funded by the William Penn Foundation.